Production of crude oil and natural gas in September 2007

for Ministry of Petroleum & Natural Gas | Date - 25-10-2007


A. CRUDE OIL PRODUCTION (MMT) – PERFORMANCE

Month / Period

Planned Target

 

Actual

Production

%age achieve-ment

Surplus(+)

Shortfall(-)

Vis-à-vis target

Surplus(+)

Shortfall(-)

Over last year

September, 2007 *

2.872

2.794

97.3

-2.7%

 

April-September, 2007 *

17.239

16.942

98.3

-1.7%

+0.7%

April-September, 2006

 

16.821

 

 

 

MMT: Million Metric Tonnes.                                                                           *: Provisional.

B. COMPANY-WISE ACHIEVEMENT

Company / State

Planned Target

(MMT)

Actual Production

(MMT)

%age achieve-

ment

Surplus(+)

Shortfall(-)

ONGC

2.234

2.135

95.6

-4.4%

  Gujarat

0.526

0.510

97.0

 

  Assam

0.133

0.103

77.4

 

  Andhra Pradesh

0.015

0.023

153.3

 

  Tamil Nadu

0.027

0.023

85.2

 

  Mumbai Region (incl Mumbai High)

1.533

1.476

96.3

 

OIL

0.286

0.242

84.6

-15.4%

  Assam

0.283

0.239

84.5

 

  Arunachal Pradesh

0.003

0.003

100.0

 

PRIVATE/JVC

0.352

0.417

118.5

+18.5%

TOTAL

2.872

2.794

97.3

-2.7%

C. REASONS FOR SHORTFALL

Company / State

Reasons for shortfall

ONGC(Gujarat)

GEB power shutdowns.

ONGC (Assam)

Environmental reasons.

ONGC (Mumbai Region)

Less than anticipated developmental inputs.

OIL (Assam)

 

Public blockades / local problems at Khagorijan, Barekuri, Chabua, Baghjan fields,

Miscreants’ activity.

A statement showing Crude Oil Production during September, 2007 and cumulatively for the period April-September, 2007 vis-à-vis planned production is at Annexure-I.

Cont’d…


A. REFINERY PRODUCTION (MMT)

                (IN TERMS OF CRUDE THROUGHPUT)

Month / Period

Planned Target

Actual

Production

%age achieve-ment

Surplus(+)

Shortfall(-)

Vis-a-vis target

Surplus(+)

Shortfall(-)

Over last year

September, 2007 *

11.662

12.741

109.3

+9.3%

 

April- September, 2007*

71.282

77.410

108.6

+8.6%

+9.8%

April- September, 2006

 

70.486

 

 

 

*: Provisional.

            The crude throughput of IOC(Barauni, Mathura and Panipat), BPCL(Mumbai and Kochi), HPCL(Mumbai & Visakh), CPCL(Manali), NRL(Numaligarh), MRPL(Mangalore) and RPL(Jamnagar) refineries have exceeded their planned target during the month under review. In case of IOC(Koyali), crude throughput was close to the target, while in IOC(Barauni and Panipat) and HPCL(Mumbai), crude throughput was much higher than the target due to deferment of shutdown.

            The crude throughput in IOC(Guwahati, Haldia and Digboi), CPCL(Narimanam), BR&PL(Assam), ONGC(Tatipaka) and EOL(Vadinar) refineries was less than the target for reasons indicated below:

            B. REASONS FOR SHORTFALL : REFINERY-SPECIFIC

Refinery

Reasons for shortfall

IOC(Haldia)

Deferment of shutdown from August to September, 2007.

IOC(Guwahati & Digboi)

As per crude availability.

EOL(Vadinar)

Deferment of planned shutdown.

            A statement showing refinery-wise production during the month of September, 2007 and cumulatively for the period April-September, 2007 vis-à-vis planned target is at Annexure-II.

REFINERY CAPACITY UTILISATION

Month

Utilisation (%)

Period

Utilisation (%)

September, 2007

104.3

April- September, 2007

103.9

September, 2006

109.5

April- September, 2006

106.1

            The refinery-wise details of the capacity utilisation during September, 2007 and cumulatively for the period April-September, 2007 vis-a-vis 2006 are given in Annexure-III.

Cont’d…


A.  NATURAL GAS PRODUCTION (MCM)

            Month / Period

Planned Target

Actual

Production

%age achieve-ment

Surplus(+)

Shortfall(-)

Vis-a-vis target

Surplus(+)

Shortfall(-)

Over last year

September, 2007 *

2775

2678

96.5

-3.5%

 

April- September, 2007 *

16232

15771

97.2

-2.8%

+1.8%

April- September, 2006

 

15494

 

 

 

            MCM: Million Cubic Metres.                                                 *: Provisional.

           

COMPANY-WISE ACHIEVEMENT

Company / State

Planned Target

(MCM)

Actual Production

(MCM)

%age achievement

Surplus(+)

Shortfall(-)

ONGC

1828

1874

102.5

+2.5%

  Gujarat

153

170

111.1

 

  Rajasthan

1

2

200.0

 

  Assam

38

42

110.5

 

  Tripura

45

42

93.3

 

  Andhra Pradesh

128

128

100.0

 

  Tamil Nadu

92

92

100.0

 

  Mumbai High

1371

1398

102.0

 

OIL

232

194

83.6

-16.4%

  Assam

207

174

84.1

 

  Arunachal Pradesh

2

2

100.0