The coal production during April-February 2018-19 was 638.46 MT as compared to 591.42 MT during corresponding period of previous year with a growth rate of 8.0% on y-o-y basis.
Coal India Limited (CIL) coal production target was fixed 610.00 MT for 2018-19. The coal production during April-February 2018-19 was 527.70 MT as compared to 495.08 MT during corresponding period of previous year with a growth rate of 6.6% on y-o-y basis.
Singareni Collieries Company Limited (SCCL) coal production target was fixed at 65.00 MT for 2018-19. The coal production during April-February 2018-19 was 57.94 MT as compared to 54.64 MT during corresponding period of previous year with a growth rate of 6.0% on y-o-y basis.
Coal production target of Captive Mines was fixed at 40.00 MT for 2018-19. The coal production during April-February 2018-19 was 44.41 MT as compared to 33.76 MT during corresponding period of previous year with a growth rate of 31.6% on y-o-y basis. Thus, the coal production target (40.00 MT) by captive mines has already been achieved by Feb-2019.
Coal production target of other mines was fixed at 15.00 MT for 2018-19. The coal production by these mines during April-February 2018-19 was 8.40 MT as compared to 7.94 MT during corresponding period of previous year with a growth rate of 5.8% on y-o-y basis.
Coal Production from CIL:Month wise
Coal Production from CIL: April-February
Coal Offtake from CIL:
Coal Offtake from CIL: April-February
Coal Supply to Power Sector from CIL:
Coal Supply to Power Sector from CIL: April-February
Total Rake Loading from CIL: Month wise
Total Rake Loading from CIL: April-February
Stock at TPPs:
Stock at TPPs:
Stock at TPPs in days:
Critical/ Supercritical TPPs:
Vendible Stock at CIL:
*****
SVS/MKV/AP